Opening soon. Receipts and payments aren't open yet.
Rail

Locomotive daily inspection log: preserve the signed report and date its exact version.

Locomotive daily inspection log: preserve the signed report and date its exact version. Keep your original source records together, then date the exact files. It does not prove that a qualified inspector physically inspected the locomotive, that defects were repaired or that regulatory recordkeeping is satisfied.

Your photos and files stay on your device, so keep them.

EXAMPLE
Locomotive daily inspection records
1 Nov 2026
Authority time: 14:02 UTC · example
Bitcoin block time: 14:10 UTC · example
Last checked: 15:02 UTC · example
✓ Dated◆ Permanent
Now keep it safe: three things
  1. Keep your photos and files unedited. The receipt only matches the originals. Put them in an album such as “My records”.
  2. Save this receipt to your camera roll.

    Keep the receipt file too. The image is a handy copy; checking needs the file.

  3. Email it to yourself.Email it to myself

    Your mail app opens a draft. Attach your receipt image and receipt file. Don’t attach your photos or documents. Timevolt does not send it or know whether it was sent.

Your record, one step at a time.

Your photos and files stay on your device, so keep them.

Local preview: files are fingerprinted here. Notes and progress stay in this browser. Keep downloaded copies; browser storage is not a backup.

0 items
How?

Add the exact original files for this part of the record. Keep them unchanged; a different export or edit has a different fingerprint.

Add link and screenshots

The link is recorded, not fetched or verified.

    0 items
    How?

    Record the date, time, place and who you spoke to. New notes are saved separately rather than editing an old note.

    How to keep notes that hold up
    Write it down

    By making a receipt you agree to the Terms and Privacy Policy. The Bitcoin record is permanent.

      By making a receipt you agree to the Terms and Privacy Policy. The Bitcoin record is permanent.

      How to keep notes that hold up

      Write notes as soon as you can. Keep the original account rather than replacing it later; the venue decides what weight it gets.

      1. Write it down straight away, on paper or in the box on a step.
      2. Put the date, time and place at the top, and who you spoke to.
      3. Use their words where you can; separate what you saw from what you were told.
      4. Sign or initial a paper note, photograph it and add the photo.
      5. Never edit an old note. Add a new dated entry when something changes. A device save time is not independent time evidence or proof of event order.
      Locomotive daily inspection records

      01 · Keep the exact files

      Keep the original files for daily equipment inspection actually walked. Include any existing photos, signed records and source-system exports.

      Records to keep: Existing capture-system and sign-off records

      Locomotive daily inspection records

      02 · Date the file’s code

      Your device fingerprints the selected file or manifest. Dated follows an independent timestamp; Permanent follows Bitcoin anchoring.

      An independent time, tied to the exact bytes.

      Locomotive daily inspection records

      03 · Keep the evidence

      Keep the original files and complete receipt separately, alongside any existing venue, signature and workflow records.

      Keep the originals too. A changed or compressed copy has a different fingerprint.

      Try a file. It stays here.

      Make a test receipt on this device.

      By making a receipt you agree to the Terms and Privacy Policy. The Bitcoin record is permanent.

      or drop a file here

      Related cases

      Related cases from nearby fields. We don’t claim a time receipt would have changed the result.

      What courts, schemes and regulators say.

      Positions below refer to the cited rule or record type, not endorsement of Timevolt. This service is not represented as an eIDAS qualified timestamp provider. A non-qualified timestamp does not receive the qualified timestamp presumption.

      Needs something else · US federal

      FRA locomotive safety rule

      49 CFR 229.21 inspection and report

      Qualified designated persons inspect each in-use locomotive at least once per calendar day. Non-MU reports require specified identifiers, place, date, time, defects and employee signature; MU reporting differs. A receipt proves neither inspection nor authority.

      Source summary as of 2026-10-28. Check the current source and applicable local rules.

      Read the source
      Needs something else · US federal

      FRA locomotive safety rule

      49 CFR 229.21 report retention and repairs

      Section 229.21 requires repair notations/signatures and report retention of at least 92 days. Paragraph (a) also requires a prior-inspection record on each non-MU locomotive; MU reporting/storage rules differ.

      Source summary as of 2026-10-28. Check the current source and applicable local rules.

      Read the source

      Other ways to do this

      Prices change. Check each provider’s site for current prices and service details.

      • RailEdge Inspection

        Provides offline asset inspections, defects and evidence attachments.

        Visit site
      • DD 862 worksheet catalogue

        Provides official military locomotive worksheet listing.

        Visit site

      Proves / Doesn’t prove

      Proves

      A completed time receipt shows that the exact selected file existed by the independently witnessed time. You can check whether a later copy has the same bytes. It does not establish creation time, authorship, identity, event order, location or the truth of the contents.

      Doesn’t prove

      It does not prove that a qualified inspector physically inspected the locomotive, that defects were repaired or that regulatory recordkeeping is satisfied.

      It does not prove that a qualified inspector physically inspected the locomotive, that defects were repaired or that regulatory recordkeeping is satisfied.

      These are the bounds of a completed proof. The local tester does not establish any time. The chosen court, scheme or regulator decides what to accept.

      Questions, answered plainly.

      Your file stays on your device. During normal receipt creation, your device sends a randomized code made from its fingerprint, plus encrypted recovery data. It doesn't send the plain fingerprint or the random value that opens the code. Keep the original file and the complete receipt for checking. Privacy Policy.

      Does this prove the inspection was walked?

      No. The rule requires a qualified person to inspect; a receipt only dates a file.

      Source summary as of October 30, 2026. Check the current source and its scope.

      Context for this answer
      What goes in the report?

      Carrier and locomotive identifiers, place, date, time, defects and the inspector signature; applicable repair entries also matter.

      Source summary as of October 30, 2026. Check the current source and its scope.

      Context for this answer
      How long is the report retained?

      The cited US rule requires at least 92 days. Other obligations may also apply.

      Source summary as of October 30, 2026. Check the current source and its scope.

      Context for this answer
      Can a dated false report still be false?

      Yes. The cited rail hazmat case involved a report representing an inspection that did not occur.

      Source summary as of October 30, 2026. Check the current source and its scope.

      Context for this answer
      Does an app listing establish FRA compliance?

      No. The opened field app describes logging features; required reports and carrier procedures still need assessment.

      Source summary as of October 30, 2026. Check the current source and its scope.

      Context for this answer

      The file tester runs on your device. It does not issue a timestamp or take a payment.

      Keep the records you already have.

      Keep your original files and any existing official records while the receipt service is being prepared.