Opening soon. Receipts and payments aren't open yet.
Engineering handover

Keep the existing commissioning test sheets, measurement exports and handover record as a dated version.

Keep the existing commissioning test sheets, measurement exports and handover record as a dated version. Keep your original source records together, then date the exact files. It does not prove a test occurred, measurement accuracy, system performance, client acknowledgment or contractual acceptance.

Your photos and files stay on your device, so keep them.

EXAMPLE
Acceptance test results at handover
1 Nov 2026
Authority time: 14:02 UTC · example
Bitcoin block time: 14:10 UTC · example
Last checked: 15:02 UTC · example
✓ Dated◆ Permanent
Now keep it safe: three things
  1. Keep your photos and files unedited. The receipt only matches the originals. Put them in an album such as “My records”.
  2. Save this receipt to your camera roll.

    Keep the receipt file too. The image is a handy copy; checking needs the file.

  3. Email it to yourself.Email it to myself

    Your mail app opens a draft. Attach your receipt image and receipt file. Don’t attach your photos or documents. Timevolt does not send it or know whether it was sent.

Your record, one step at a time.

Your photos and files stay on your device, so keep them.

Local preview: files are fingerprinted here. Notes and progress stay in this browser. Keep downloaded copies; browser storage is not a backup.

0 items
How?

Add the exact original files for this part of the record. Keep them unchanged; a different export or edit has a different fingerprint.

Add link and screenshots

The link is recorded, not fetched or verified.

    0 items
    How?

    Record the date, time, place and who you spoke to. New notes are saved separately rather than editing an old note.

    How to keep notes that hold up
    Write it down

    By making a receipt you agree to the Terms and Privacy Policy. The Bitcoin record is permanent.

      By making a receipt you agree to the Terms and Privacy Policy. The Bitcoin record is permanent.

      How to keep notes that hold up

      Write notes as soon as you can. Keep the original account rather than replacing it later; the venue decides what weight it gets.

      1. Write it down straight away, on paper or in the box on a step.
      2. Put the date, time and place at the top, and who you spoke to.
      3. Use their words where you can; separate what you saw from what you were told.
      4. Sign or initial a paper note, photograph it and add the photo.
      5. Never edit an old note. Add a new dated entry when something changes. A device save time is not independent time evidence or proof of event order.
      Acceptance test results at handover

      01 · Keep the exact files

      Keep the original files for acceptance test results at handover. Include any existing photos, signed records and source-system exports.

      Records to keep: Commissioning test sheets and measurement exports, acknowledged by client

      Acceptance test results at handover

      02 · Date the file’s code

      Your device fingerprints the selected file or manifest. Dated follows an independent timestamp; Permanent follows Bitcoin anchoring.

      An independent time, tied to the exact bytes.

      Acceptance test results at handover

      03 · Keep the evidence

      Keep the original files and complete receipt separately, alongside any existing venue, signature and workflow records.

      Keep the originals too. A changed or compressed copy has a different fingerprint.

      Try a file. It stays here.

      Make a test receipt on this device.

      By making a receipt you agree to the Terms and Privacy Policy. The Bitcoin record is permanent.

      or drop a file here

      Real cases: why the saved copy matters.

      Real cases where dated records mattered. We don’t claim a time receipt would have changed the result.

      England and Wales · 2022

      Compare handover records against the intended dates

      An owner and builder disputed delays at an energy plant. Real handover data showed work lagged behind plans. The court used it to assess delay and upheld the owner's right to end the deal, among broader mixed claims.

      Summarized on Oct 29, 2026

      Read the source ›

      Related cases

      What courts, schemes and regulators say.

      Positions below refer to the cited rule or record type, not endorsement of Timevolt. This service is not represented as an eIDAS qualified timestamp provider. A non-qualified timestamp does not receive the qualified timestamp presumption.

      Needs something else · UK local exhaust ventilation;HSE guidance

      HSG258, third edition (2017)

      Commissioning report records test observations and performance benchmarks used with later examination and maintenance records.

      Sector-specific professional guidance; a file receipt cannot measure or establish adequate control.

      Source summary as of 2026-10-29. Check the current source and applicable local rules.

      Read the source
      Needs something else · US federal-facility guidance

      DOE FEMP commissioning process

      Guidance includes test analysis, deficiency tracking, retesting and handoff documentation describing the process and actions.

      Guidance is not universal contract acceptance or an external timestamp endorsement.

      Source summary as of 2026-10-29. Check the current source and applicable local rules.

      Read the source

      Other ways to do this

      Prices change. Check each provider’s site for current prices and service details.

      • CxAlloy

        Provides Asset-linked tests, issues and commissioning reports.

        Visit site
      • Bluerithm

        Provides commissioning forms, checklists, reports and workflows.

        Visit site
      • LibreOffice Calc/manual files

        Keeps spreadsheet entries and supporting files in a folder.

        Visit site

      Proves / Doesn’t prove

      Proves

      A completed time receipt shows that the exact selected file existed by the independently witnessed time. You can check whether a later copy has the same bytes. It does not establish creation time, authorship, identity, event order, location or the truth of the contents.

      Doesn’t prove

      It does not prove a test occurred, measurement accuracy, system performance, client acknowledgment or contractual acceptance.

      It does not prove a test occurred, measurement accuracy, system performance, client acknowledgment or contractual acceptance.

      These are the bounds of a completed proof. The local tester does not establish any time. The chosen court, scheme or regulator decides what to accept.

      Questions, answered plainly.

      Your file stays on your device. During normal receipt creation, your device sends a randomized code made from its fingerprint, plus encrypted recovery data. It doesn't send the plain fingerprint or the random value that opens the code. Keep the original file and the complete receipt for checking. Privacy Policy.

      Does a dated report establish client acceptance?

      No. The software appeal illustrates contract-specific milestones and remedies; a receipt does not supply acceptance.

      Source summary as of October 30, 2026. Check the current source and its scope.

      Context for this answer
      Should failed tests disappear from the final pack?

      TheDOE guidance includes deficiencies, retesting and final process documentation; keep the existing records distinct rather than silently replacing versions.

      Source summary as of October 30, 2026. Check the current source and its scope.

      Context for this answer
      Why keep the baseline commissioning report?

      HSE describes theLEV report as a performance benchmark for later checks.

      Source summary as of October 30, 2026. Check the current source and its scope.

      Context for this answer
      Can a report's date prove completion forecasts were right?

      No. The2022 court compared reported projections with actual handover data.

      Source summary as of October 30, 2026. Check the current source and its scope.

      Context for this answer
      Does compliance with a standard settle every promise?

      Not necessarily. The2017 engineering decision considered separate contract requirements; no general advice follows for another project.

      Source summary as of October 30, 2026. Check the current source and its scope.

      Context for this answer

      The file tester runs on your device. It does not issue a timestamp or take a payment.

      Keep the records you already have.

      Keep your original files and any existing official records while the receipt service is being prepared.